dominator99
Dabbler
- Joined
- Jan 2, 2014
- Messages
- 35
Hi All
I have 4No. mirrors (Mirror-1 to Mirror-4) each scheduled to run a scrub on the same day but at different times. Today was the first time the scrubs were scheduled to run; only 3 of the 4 scrubs ran as scheduled, the 4th had to be started manually using the shell command zpool scrub Mirror-2 which completed successfully without errors.
Any suggestions as to why the scheduled Mirror-2 didn't run?
I have 4No. mirrors (Mirror-1 to Mirror-4) each scheduled to run a scrub on the same day but at different times. Today was the first time the scrubs were scheduled to run; only 3 of the 4 scrubs ran as scheduled, the 4th had to be started manually using the shell command zpool scrub Mirror-2 which completed successfully without errors.
Any suggestions as to why the scheduled Mirror-2 didn't run?