cloudsync.sync task stuck at 0.00%

indivision

Guru
Joined
Jan 4, 2013
Messages
806
With RC2 I'm getting a cloudsync.sync task stuck at "Starting" 0.00%

I tried resetting and it came back.

I do have a couple of scheduled B2 Cloud Sync Tasks. But, they show as having completed successfully.

So, not sure what this stuck task is about. Anyone else seeing the same? (Issue was not present in last build.)
 

Kris Moore

SVP of Engineering
Administrator
Moderator
iXsystems
Joined
Nov 12, 2015
Messages
1,471
I've got a couple of cloud-sync tasks here, haven't seen this specific issue though.

Go ahead and file a ticket on https://jira.ixsystems.com and attach a debug file (System -> Advanced -> Download Debug) and we'll take a look.
 

indivision

Guru
Joined
Jan 4, 2013
Messages
806
Done. Thank you.

 
Top