Alpinesun
Cadet
- Joined
- Mar 5, 2018
- Messages
- 5
All,
I'm seeing some strange behaviour with Bhyve and Windows 7 and 10 on install with 2 vcpu's configured in the VM.
Basically it gets to 'Expanding Windows files' and gets stuck there at random percentages compete. If I install on a single vcpu it works and installs no problem. If I then add a second vcpu once installed the VM hangs at the Windows loading screen.
Running:
Build FreeNAS-11.1-U2
Platform AMD FX(tm)-8350 Eight-Core Processor
Memory 32688MB
Anyone have any ideas?
Regards,
Col
I'm seeing some strange behaviour with Bhyve and Windows 7 and 10 on install with 2 vcpu's configured in the VM.
Basically it gets to 'Expanding Windows files' and gets stuck there at random percentages compete. If I install on a single vcpu it works and installs no problem. If I then add a second vcpu once installed the VM hangs at the Windows loading screen.
Running:
Build FreeNAS-11.1-U2
Platform AMD FX(tm)-8350 Eight-Core Processor
Memory 32688MB
Anyone have any ideas?
Regards,
Col