MMacD
Explorer
- Joined
- Dec 12, 2014
- Messages
- 55
I'm trying to set up SMART, but am not sure I've got it right. The docs aren't helpful.
To run, on all 3 drives in the mirror, a short test once a week on Sunday at 0200, and a long test once a month on the 1st at 0200, I created 2 tests, selecting all 3 drives, Sunday, and every day of the month except the 1st for the short test, and all 3 drives, the 1st of the month, and every day of the week for the long test. Am I going to get what I want? The only reason I'm leery is the "each selected..." on the tabs. It makes me worry that the conditions might get OR'd together rather than AND'd.
And does scrub scheduling follow the same pattern?
To run, on all 3 drives in the mirror, a short test once a week on Sunday at 0200, and a long test once a month on the 1st at 0200, I created 2 tests, selecting all 3 drives, Sunday, and every day of the month except the 1st for the short test, and all 3 drives, the 1st of the month, and every day of the week for the long test. Am I going to get what I want? The only reason I'm leery is the "each selected..." on the tabs. It makes me worry that the conditions might get OR'd together rather than AND'd.
And does scrub scheduling follow the same pattern?