new production build, whats needed before data is thrown on it?

Status
Not open for further replies.

aadje93

Explorer
Joined
Sep 25, 2015
Messages
60
Hi guys,

My build is done, the lsi 9211-8i 's are flashed to IT mode (V20) succesfully; now installing freenas itself on my usb sticks (32gb sandisks)

Now my questions;

I have 2 Intel DC S3700 (100gb each) for ZIL/SLOG
i have 2 samsung 840 evo 120gb vor L2ARC
128GB rammn, now 6 4TB drives for a Z2 vdev, which eventually will extend to 24 drives (4 z2 vdevs)

I've read about scrubbing and smart (long/short) tests biweekly, but what else has to be setup before i put my data on the new zpool?

I would like to hear from you asap, got some days off now so i got plenty of time to get my system ready :)
 

Bidule0hm

Server Electronics Sorcerer
Joined
Aug 5, 2013
Messages
3,710
You should follow the burn-in thread ;)
 

Fuganater

Patron
Joined
Sep 28, 2015
Messages
477

Bidule0hm

Server Electronics Sorcerer
Joined
Aug 5, 2013
Messages
3,710
Yep, I'm currently at 90 % in 144 hours for a 4 TB drive so it'll be completed in about 159 hours total or a little less than a week, it's long...
 

aadje93

Explorer
Joined
Sep 25, 2015
Messages
60
thanks for your suggestions, now i'm trying to make the volume, but i'm wondering how do i make a raid 1 and raid 0 for the zil resp l2arc? :)
 
Status
Not open for further replies.
Top