damaddbomma
Dabbler
- Joined
- Aug 27, 2019
- Messages
- 13
Ok...to start with, I recently changed motherboards (to a SuperBoard with Xeon X3) which is going to allow me to increase both the number of drives and the capacity of my system. I am going to be installing a SAS HBA board to drive the four 3TB hard drives I am going to install in two mirrored VDEVs. I currently have two 1TB hard drives (not mirrored so about 2TB of storage) in the system.
It took me quite a while to get the jails and storage the way I like it and would like to move all the data and jails over to the new pool and then disconnect the old pool. Can someone give me an easy way to do this without having to recreate the jails? The jails currently contain Transmission and Emby.
Thanks!
It took me quite a while to get the jails and storage the way I like it and would like to move all the data and jails over to the new pool and then disconnect the old pool. Can someone give me an easy way to do this without having to recreate the jails? The jails currently contain Transmission and Emby.
Thanks!