Okay, so I'm running out of space (no surprise there). I'm planning on building either a 6x4TB or 8x4TB vdev and was thinking I might add the Vdev and stripe is with my existing one to simplify management. I wouldn't need to create a new share or datastore and so on. Are there any downsides to this configuration or gotchas I should be aware of? Might it be a better idea to just have two pools? As an aside the existing pool is running on 7200RPM disks and the new one will likely be 5400/5900 RPM disks and I've heard both sides of the argument for not mixing disk speeds in the same pool.
 

cyberjock

Inactive Account
Joined
Mar 25, 2012
Messages
19,525
You can mix and match, just understand that the total I/O and possible throughput (assuming it isn't limited to your LAN connections) is going to be a hybrid of the two vdevs.

Having two pools is very much a personal choice and so I won't try to answer a question like that.
 
Status
Not open for further replies.
Top