Jobs Screens
1 minute read.
The Jobs screens, accessed from the Running Jobs window after clicking Go to Jobs, shows all jobs executed on the system.
There are three tab views, All, Active and Failed. All displays by default.
Use the arrow display options to change the number of jobs per screen. Options are the default 10, 50 or 100.
Click View to display the argument passed for the selected job.
Use the
arrow beside the State or ID header to change the display order, or the arrow to return to the top down display order.The Failed screen lists failed jobs.
Click View to show the job log. The system error for this failed job displays at the bottom of the log file.