Hello, I have set up a bridge network on TrueNAS Scale for my VM using the methods described in the documentation. However when I have this bridge active I am unable to synchronize my charts.
I have reviewed some other solutions, indicating a bios hw_clock disagreement and other things, but those were not the issue for me. Deleting the bridge solves the issue, however that limits the capabilities of running a VM on TrueNAS without being able to reach the host machine. Is there another configuration I am able to do to be able to have a function VM with reachback to host and the Apps available?
Thank you for the help!
TrueNAS Scale 22.12
Lenovo M90q
12th Gen Intel(R) Core(TM) i5-12500T
16 GB RAM
2 TB ZFS storage
Failed to sync OFFICIAL catalog: [EFAULT] Failed to clone 'https://github.com/truenas/charts.git'
I have reviewed some other solutions, indicating a bios hw_clock disagreement and other things, but those were not the issue for me. Deleting the bridge solves the issue, however that limits the capabilities of running a VM on TrueNAS without being able to reach the host machine. Is there another configuration I am able to do to be able to have a function VM with reachback to host and the Apps available?
Thank you for the help!
TrueNAS Scale 22.12
Lenovo M90q
12th Gen Intel(R) Core(TM) i5-12500T
16 GB RAM
2 TB ZFS storage