Hey all, Just had a quick question on scheduling smart tests and scrubs. I currently have it configured to perform a Long Smart test on the first of every month. Every 7 days after that it performs a short test. For scrubs, I have the machine setup to do a scrub on the 2nd and 15th of every month.
Is this too much? I feel as though this is really a personal preference thing, but if most here think I'm over doing it I can tweak my schedules.
Thanks,
-RYknow
Is this too much? I feel as though this is really a personal preference thing, but if most here think I'm over doing it I can tweak my schedules.
Thanks,
-RYknow