William Bravin
Contributor
- Joined
- Mar 16, 2016
- Messages
- 194
Hello all
Please be patient with me. I will be increasing the size of my storage shortly.
As per my signature I have 2 freenas servers
Both with 4 X 2 tb drives
I would like to increase on one server from 2 to 3 TB drives.
I read the manual and I want to ensure i do not screw this up more than i normally will.
On one server
1) I put a drive offline
2) remove the drive from the server
3)turn server off
4) Insert the 3tb drive
5) turn server on and make new drive online. ....Now the server has 3 X 2TB and 1 X 3 TB drives
6) wait until new drive is populated
Once complete step 1 , 2, 3, 4, 5 and 6
7) repeat the process for each additional rive
now the server will 4 x 3 tb drives
I will the add the 4 X 2 tb to the redundant server making it 8 X 2 TB and rebuild the pool on a Z1
Rsync all my media from server A to the redundant server
Am i correct?
Thank you for confirming (or Not)
Please be patient with me. I will be increasing the size of my storage shortly.
As per my signature I have 2 freenas servers
Both with 4 X 2 tb drives
I would like to increase on one server from 2 to 3 TB drives.
I read the manual and I want to ensure i do not screw this up more than i normally will.
On one server
1) I put a drive offline
2) remove the drive from the server
3)turn server off
4) Insert the 3tb drive
5) turn server on and make new drive online. ....Now the server has 3 X 2TB and 1 X 3 TB drives
6) wait until new drive is populated
Once complete step 1 , 2, 3, 4, 5 and 6
7) repeat the process for each additional rive
now the server will 4 x 3 tb drives
I will the add the 4 X 2 tb to the redundant server making it 8 X 2 TB and rebuild the pool on a Z1
Rsync all my media from server A to the redundant server
Am i correct?
Thank you for confirming (or Not)