jarrod1024
Cadet
- Joined
- Oct 10, 2019
- Messages
- 2
I am looking to build a new freenas server to replace an old one which currently has 2X 10Tb reds mirrored.
I have 5X 10Tb reds for the new server but I am also hoping to use the 2X 10TBs from the old server for a total of 70Tb raw.
The server I am planning on using has 12X 3.5" drive bays and an H200 HBA.
I am looking at doing 1 RaidZ2 Vdev with the 7 drives. This will leave me 5 drive bays to add another 5 disk vdev for future expansion.
Is this a good configuration or am I better to do 6 drives for my first vdev so that in the future if i add another vdev they have the same number of disks?
I have 5X 10Tb reds for the new server but I am also hoping to use the 2X 10TBs from the old server for a total of 70Tb raw.
The server I am planning on using has 12X 3.5" drive bays and an H200 HBA.
I am looking at doing 1 RaidZ2 Vdev with the 7 drives. This will leave me 5 drive bays to add another 5 disk vdev for future expansion.
Is this a good configuration or am I better to do 6 drives for my first vdev so that in the future if i add another vdev they have the same number of disks?