I am on TrueNAS 12.0-U4.1. I came from the last freenas where all my settings appear to have been upgraded to the new TrueNAS. I have two things scheduled;
scrub pool
run S.M.A.R.T.
Now when the scrub pool runs and gets done I get the notification at the top which I open and viola, it says it completed the task on the day of the schedule.
But I was noticing (and I do not remember if in FreeNAS did this) that I do not see a notification that S.M.A.R.T. ran.
Q1 - is this by design? Looked in the forums (I could have missed it), but no thread on this
Q2 - if there is no porting of the details to the notification then is there a command I can run in the shell to ask if it ran and if so, was good or bad?
Thank you
scrub pool
run S.M.A.R.T.
Now when the scrub pool runs and gets done I get the notification at the top which I open and viola, it says it completed the task on the day of the schedule.
But I was noticing (and I do not remember if in FreeNAS did this) that I do not see a notification that S.M.A.R.T. ran.
Q1 - is this by design? Looked in the forums (I could have missed it), but no thread on this
Q2 - if there is no porting of the details to the notification then is there a command I can run in the shell to ask if it ran and if so, was good or bad?
Thank you