Cloud Sync Task Size

ladams

Cadet
Joined
Jul 6, 2023
Messages
1
Trying to figure out what is wrong with my cloud backup task from TrueNAS. When I go to test the dry run it shows 235.338 TiB will be Transferred. When I check the logs I can see it is trying to send the entire iscsi mount across twice. The entire pool is only 150TB so I'm not sure what is going on here. Has anyone seen this behavior before? Curious if it is a silly mistake I made somewhere.

2023/07/06 14:23:19 NOTICE: VEEAM: Skipped copy as --dry-run is set (size 100.000Ti)
2023/07/06 14:23:20 NOTICE: xen-backups/VEEAM: Skipped copy as --dry-run is set (size 100.000Ti)
 
Top